More Upgrades at Gwinnett LZU

LZU Runway

A paving project will soon increase the load bearing surface of runways 7/25 to accommodate heavy tandem wheel aircraft. This project scheduled for August 2020 will also remedy the “dip” midcourse on the runways allowing for smoother takeoff and rollout of the 6000’ where Air Harbor is located. Blue skies ahead with this new and longer lasting resurface project.

Leave a Reply

Your email address will not be published. Required fields are marked *